Université Krems

Krems, Österreich
Foto © Dietmar Feichtinger Architectes
Foto © Margherita Spiluttini
Foto © Margherita Spiluttini
Foto © Margherita Spiluttini
Foto © Margherita Spiluttini
Foto © Margherita Spiluttini
Foto © Margherita Spiluttini
Architekten
Dietmar Feichtinger Architectes
Standort
Doktor-Karl-Dorrek-Straße, 3500 Krems, Österreich
Jahr
2005
Bauherrschaft
FAVIA represented by NÖ Hypo Bauplanung

Mies van der Rohe Award 2007, nomination
Austrian 'Bauherrenpreis' 2007
Contract.world.Award 2006, shortlisted
Architecture Award of the Land of Lower Austria 2005
‘AustrianConstructionPrize 2005’

The new buildings for the University Campus Krems are situated on the edge of the rolling vineyards of the Wachau region, north of Wien. The buildings house the postgraduate Danube University, the University of Applied Sciences and the Centre for Film. All new buildings are visually linked by a coherent facade system of vertical, perforated aluminium louvres for the upper floors, and full-height glazing for ground and first floors.

In a comb-like structure, three four-storey blocks oriented east–west extend an existing three-winged building dating from 1922. These contain university amenities, such as a library, a refectory, several seminar rooms, specialist laboratories and offices. To the west, an irregularly shaped auditorium closes the compound. To the east, an old boiler house with a characteristic brick chimney holds a cinema and bar connected via a subterranean exhibition space to a smaller four-storey cube, the Centre for Film. Across a small stream, a five-storey block for the University of Applied Sciences obliquely faces the other buildings, formally linked to the campus through the common facade system. From the outside, the individually adjustable louvres shimmer when turned to different angles. Their perforation ensures that the view out is never completely blocked but instead only filtered, as is the light that falls on to exposed concrete ceilings and walls, open installations and mostly grey floors. Concrete, steel and glass combined with rectangular forms and simple plans give the complex a technical, clean and light appearance inside and out. Thus, the buildings profit from the contrast with the nearby vineyards and detached villas.

Competition 11 | 2001
Start of Planning 02 | 2002
Start of Construction 07 | 2003

Surface 16675 m²

Dazugehörige Projekte

  • Promenade Favorita, Lugano TI
    mavo gmbh
  • Garten Höhenweg St.Gallen
    mavo gmbh
  • Sagiareal, Greppen LU
    mavo gmbh
  • Progressiver Reinraumausbau
    Lindner Group
  • Büro Allmendstrasse
    BFB Architekten AG

Magazin

Andere Projekte von Dietmar Feichtinger Architectes

Footbridges over the Seine River
Paris, Frankreich
Siège Social VEOLIA
Aubervilliers, Frankreich
Passerelle de Franchissement du Bassin de Commerce
Cherbourg, Frankreich
Sécurisation des abords de la tour Eiffel
Paris, Frankreich
Centre sportif Hector Berlioz
Vincennes, Frankreich