kinderkunstlabor

Studie Sankt Pölten, Austria
Eingangsbereich
Photo © HOLODECK architects
Ausstellungsbereich
Photo © HOLODECK architects
Strassenansicht
Photo © HOLODECK architects
Strassenansicht
Drawing © HOLODECK architects
Parkansicht
Drawing © HOLODECK architects
Längsschnitt 1
Drawing © HOLODECK architects
Längsschnitt 2
Drawing © HOLODECK architects
Grundriss EG
Drawing © HOLODECK architects
Grundriss OG
Drawing © HOLODECK architects
Architects
HOLODECK architects
Year
2021
Team
Marlies Breuss, Michael Ogertschnig, Zois Chionidis, Alessandro Zerbi, Julia Binder, Marc Werner
Landschaftsarchitektur
Karin Graf
Tragwerkstruktur
Martin Haferl
Energiekonzept
Peter Holzer

The city of Sankt Pölten extends their cultural institutions with a space for children, where they can encounter with contemporary art. Next to the Festspielhaus, Landesmuseum, Klangturm and Landesbibliothek a parklike area is selected to host this function close to the government district Landhaus, but adjacent to a busy street. Taking into consideration the existing infrastructure and local changes as vital parameters, the project responds to the area’s up and coming status as an extension of the surrounding culture and landscape. It proposes a space for children to get in contact with artists working in the fields of painting, sculpture, photography, music, literature, as well as multimedia and various other interdisciplinary forms of art production. Thus, creating a building for creativity, that motivates children to experience various art techniques, to experiment with media, and to form their own works of art.

Three levels are organised horizontally alongside the street to protect outdoor areas inside Altona Park from traffic noise. Ramps guide children through the building passing different kinds of trees, which are embedded into the spatial arrangement. Children are always connected to nature while strolling from one exhibition area to the next until reaching their experimental laboratories on the 1st level for their own art productions. One of these spaces extend beyond the footprint of the structure and whilst enclosing a Metasequoia tree next by, hover above ground. The office rooms are found on the 2nd level and can be quickly accessed through a central staircase and elevator, positioned close to the entrance spot and cafe.

Related Projects

  • Wellness Bogn Sedrun
    Walter Bieler AG
  • Promenade Favorita, Lugano TI
    mavo gmbh
  • Garten Höhenweg St.Gallen
    mavo gmbh
  • Sagiareal, Greppen LU
    mavo gmbh
  • Progressive cleanroom expansion
    Lindner Group

Magazine

Other Projects by HOLODECK architects

floating house
Siegenfeld, Austria
earthquake memorial
Nantou
roof transformations
Vienna, Austria
WDR crossmedia house
Cologne
double vision
Kulturforum Berlin