Foto © Ronald Tilleman

Arnhem Central converts several regional routes and high speed trains to Germany. As passenger numbers will continue to grow, the railway infrastructure is being substantially revitalized. On the train station level a new 4th platform will be added and all current platform roofs will be replaced. The design concept for the new platform roofs provides a sense of light and space. Large roof lights, which together with the structural spans, add to a positive experience of the transfer platforms and surroundings. The elevated footbridge is fully integrated in the design, connecting the different platforms with each other and with the north entrance of the train station. The electrified system has also been integrated into the roof structure, giving a uniform appearance across all platforms.

Foto © Ronald Tilleman
Foto © Tim Snoek
Foto © Ronald Tilleman
Foto © Ronald Tilleman

Arnhem Central platform coverings

 Torna alla Lista di Progetti
Sede
Arnhem, Paesi Bassi
Anno
2011

Altri progetti di UNStudio 

Centre for Virtual Engineering ZVE Fraunhofer Institute
Stuttgart, Germania
The Scotts Tower
Singapore, Singapore
Ringroad
Den Bosch, USA
MY Lounge Chair
Salone del Mobile, Milano, Italia
Offices “La Defense”
Almere, Paesi Bassi