Barkly Plaza

Moscow, Russia
写真 © Yuri Palmin
写真 © Yuri Palmin
写真 © Yuri Palmin
写真 © Yuri Palmin
写真 © Yuri Palmin
Site plan
図面 © Sergey Skuratov Architects
建築家
Sergey Skuratov Architects
場所
‘Ostozhenka’ neighborhood, Prechistenskaya quay, 17-19, Kursovoy lane, 17, Moscow, Russia
2008
Object name
Multifunctional administrative and residential complex at Prechistenskaya quay
Function
Housing, offices, trade
Author
S. Skuratov (lead author)
Architectural concept
A. Medvedev — lead architect, Y. Kovaleva, N. Ishutina, N. Demidov, P. Shalimov, P. Karpovsky, I. Ilyin, T. Gruzdeva, E. Fonskay
Basic design
A. Medvedev (lead architect), N. Ishutina, N. Demodov, P. Shalimov.
Detailed design
N. Demidov (lead architect), P. Karpovsky, Y. Klevakin
Project
2003–2004
Construction
2004–2007
Project stages
architectural contept, basic design, detailed design, architectural supervision
Total area of the object
23 920 m²
overground
15 150 m²
underground
8 770 m²
Construction volume
92 040 m³
Site area
5 566 m²
Area of development
4 263 m²
Area of landscaping
1 017 m²
Number of floors
6-7
Number of flats
40
Number of car places in the underground parking
147

The building continues to form a new front line of the embankment, the process which had been started by building the new office of Moscow International Bank (MIB) quite a few years ago. From the urbanistic point of view the intention was to enlarge the scale of structures here in order to make the quay more accomplished and city-like character. On the other hand there always is the necessity to preserve historic dominance of Kremlin towers, Christ-the-Savior temple and other local historic marks, so it led to disconnectedness of volumes in the front façade of the new complex.

Three units of the complex facing the embankment are 5 storey heigh at the very front and one more level is added further to the rear side of each unit, making an indention in the roof line. The four units lined along the Kursovoy pereulok have 4-7 levels. The main idea of the whole composition is based on this indention device - two units so to say step out of the embankment front line in the direction of the Kursovoy pereulok. These moved volumes are superimposed onto the 3-4-storey unit along the Kursovoy pereulok. Thus the emptied space between the multi-storey units forms the system of green yards with lawns on the roof of the single-storey "traces" of the shifted units.

External finishing (façade) is covered with light-shade Jurassic stones with surface treated in three different types, plus differently shaded and toned glass in dark-grey aluminum frames. The idea of the embankment façade was to make an impression of balconies, loggias, ventilation grids and other architectural details sprout through glass surfaces of different transparency. These details serve as a link to the more classic facades of the nearby buildings, especially on the other side of the complex (Kursovoy pereulok).

関連したプロジェクト

  • Gebäudeadaptierungen Rathausbereich - Zwentendorf
    maul-architekten zt gmbh
  • FON - Wohnbau und Kindergarten Fontanastraße
    GERNER GERNER PLUS
  • GOLD - Wohnbau Goldberg
    GERNER GERNER PLUS
  • BENE - Wohnbau Benedikt
    GERNER GERNER PLUS
  • PUCH - Wohnbau Puchsbaumgasse
    GERNER GERNER PLUS

Magazine

Sergey Skuratov Architects によるその他のプロジェクト

Burdenko Street
Moscow, Russia
Opera and Ballet Theatre
Perm, Russia
Danilovsky Fort
Moscow, Russia
Garden Quarters. Second block
Moscow, Russia
Headquarters "Gazprom Neft"
Saint-Petersburg, Russia