照片 © J. Sokolowski
照片 © J. Sokolowski
照片 © J. Sokolowski
可视化 © HS99
照片 © HS99

Sacrisity

 回到项目列表
年份
2001

The underground structure of the sacrisity was divided into three main zones: the first one is a corridor which is an extension of the stairs, together with the adjacent wardrobe and the toilet; the second one is the space for awaiting and meetings with the faithful (this is where also the vault was installed, where monstrances and valuable liturgical vessels are kept behind armour glass); the third one is the proper sacristy.

Concrete, wood, stone and frosted glass are the only materials used for the construction of this structure (also for the interior decoration).

以下出品方的其他项目 HS99

Academic Library
Katowice, Poland
Glos Pomorza
Koszalin, Poland
Market Square 2
Koszalin, Poland
City Hall
Konstancin, Poland
H8
Jozefow near Warsaw, Poland