Office Building Oskar

Munich, Germania
Lobby
Foto © Fantomas
Light Installation
Foto © Fantomas
Reception Desk
Foto © Fantomas
Architetti
Arnold / Werner
Sede
Oskar-von-Miller-Ring 20, 80333 Munich, Germania
Anno
2018
Cliente
Hines
Team
Arnold / Werner Architekten
Signaletics and Light Installation
Fantomas

In 2018, A/W redesigned all the public areas at Siemens Headquarters, originally built in 1999 by Richard Meier. The round, 8-metre-high entrance hall now serves as a reception and lobby. The reception desk made of solid Italian Carrara marble and a blue-and-grey-coloured carpet are positioned in the centre of the lobby. Directly above and framed by floor-to-ceiling curtains is a light installation almost 10 metres in diameter with 1,200 stainless-steel interactive LED rods from the design agency Fantomas.

Progetti collegati

  • Shanghai Suhe MixC World
    KOKAISTUDIOS
  • Welcome to the Stage!
    Kjellander Sjöberg
  • Hovering Kan-Too – Great Bay Area Center Showroom
    Wutopia Lab
  • Stockwell-Rodríguez Residence
    Belmont Freeman Architects
  • Haunsbergstraße | 1. Preis
    Architektinnen Schremmer.Jell ZT GmbH

Rivista

Altri progetti di Arnold / Werner

Wohnung Reitmorstraße
München, Germania
Bungalow Germering
München, Germania
Fantomas Design
München, Germania
Penthouse Maxvorstadt
München, Germania
Haus A/Z
Germania